EP is currently working with the Town of Kingston to mitigate roadway flooding on Thomas Street and Ring Road. Increased localized flooding in these low-lying areas cause challenges and safety issues to the community and adjacent property owners.
EP conducted field investigations, borings, hydrologic-hydraulic modelling, and prepared bid and design documents for the Town. The designs incorporate new stormwater treatment for total suspended solids remove of as least 80% and subsurface infiltration below the roadways. The design will add up to 93,000-gallons and 17,000-gallons of stormwater storage and recharge on Thomas Street and Ring Road, respectively.
The project is expected enter the bidding phase this summer.